Skip to content
Home›Network development

We build the ground half

Backhaul, private LTE and 5G, towers and teleport integration. The part of the business that puts engineers in boots rather than in front of a dashboard.

Backhaul and transmission

Licensed microwave, unlicensed links where the budget demands it, and fibre where the route exists. Path surveys, link budgets, spectrum applications and the build itself.

  • Path and interference surveys
  • Licensed and unlicensed microwave
  • Fibre route design and supervision
  • Satellite backhaul integration

Private LTE and 5G

Campus and industrial networks for mines, ports, plants and large estates, where wi-fi stops being credible and coverage has to be engineered.

  • RF planning and site design
  • Core and RAN deployment
  • SIM and device management
  • Handover to your team or managed by us

Towers and passive infrastructure

Masts, rooftops, power, grounding and the unglamorous work that determines whether a site survives its first winter.

  • Structural and wind-load review
  • Power, solar and battery sizing
  • Lightning protection and grounding
  • Access, permits and landowner agreements

Teleport and ground segment

Integrating satellite capacity into an existing core: peering, routing, monitoring and the operational runbooks that make it supportable.

  • Gateway and teleport integration
  • Routing, peering and IP transit
  • NOC tooling and alerting
  • Runbooks and staff training

How a project runs

Five phases, fixed deliverables at each one, and a go or no-go decision you are allowed to take.

  1. 01

    Survey

    Site visit, path analysis, power and access. Deliverable is a report, including the reasons not to proceed.

  2. 02

    Design

    Link budgets, RF plan, bill of materials, permits needed and a build schedule with the long-lead items named.

  3. 03

    Build

    Civils, mounting, cabling, power and commissioning, with weekly progress against the schedule.

  4. 04

    Accept

    Measured throughput, latency and availability against the design. You sign when the numbers match, not before.

  5. 05

    Operate

    Monitoring, spares, scheduled maintenance, and a handover pack if you would rather run it yourself.

Projects are quoted fixed-price after the survey. We do not bid a build we have not walked.